A trip through the process of cabin 201's shower remodel.
201 had twenty year old tile-on-wood walls and a cast iron tub. Over time water began seaping into the wall framing and floor, and the heavy tub began to sag.
The wall rot.
Some fresh patch up framing, a new solid floor, and new plumbing.
Fresh hardibacker and a new pre-fab shower pan.
And a finished shower (waiting on a glass door and two more heads).
Thursday, March 13, 2008
Subscribe to:
Posts (Atom)